Sunday, November 21, 2021

11-20-2021 Holy House

11/29 Dallan brings a window. pay 220 to Victor for installation. 11/28/2021 Sunday Yesterday, Lowes delivered 2 bathtubs. Victor almost finished siding. 11/20/2021 Ivan came he finished his job on framing. cost 2900 plus the nail 53.48; Ivan didn't install ladder on the upper level where the air conditioning unit need to ask Mark from HVAC what is needed to be done from Diipendra rocksheet, drywall, preparation and paint 11/22/2021 sign contract with David from ff insulation; i clean up everywhere; i found a beam need a nail 11/23/2021 mark is coming, diipendra has done on the basement to install fan in the bath room; 40 We got Victor offer. Hu installed 6ft door, some wood tube put nails on some 2x4 wood 41 Ordered 2 bathtub, one is left dranage, one is right dranage. 42 the main door buttom need to be fixed, skylights need framing, siding delay a week, tommy is coming 43 11/03 we went to visit Biltmore estate 44 Saturday morning, Ivan came to see how much he can do the framing. 11/11 hu is going home tomorrow. he finished tile on lotus house today 11-12 Ivan came to do the framing, mark came to explain how to do it with the HVAC turnel. $2900.00 4 skylights. 11-13 2 bathtub deliver on Saturday 11/12 Ivan didn't come to work, because there is no wood, 2x4 indoor wood; Summit will deliver 40 pieces of 2x4; Tommy is bring his truck here ready to work on Monday 11/13 Ivan will come, ps paid jivatma, $600.00 for moving siding materials on the deck. 11/15 Monday Tommy work on the ceptic system, not the road, Ivan on framing, Plumber Chris works, need insulation, dry wall, sending and prepare for painting, painting, 11/16 Insulation appointment Today 10:30 am; Tommy will finish ceptic system Today;

No comments:

Post a Comment