Monday, February 14, 2022
02/14/2022
dumpter swap schedule:
2/8 one time
before 2/8 two times
2/12Saturday
yesterday we found out there were no ceilings on two closet on the upper level; some places need to have 2x4 there.
on the sun room we will put a french door, on the top of the french door, we will put a glass up there.
2/15 call and swap dumpster
2/17
They wanted to make a deal with carvana. next wed appointment
Landa Pilipe finished taping and parting. Today Saturday will do sending. need two days to finish.
Christopher Shane will come to see how to install door.
Dumpster change back to the place
saw a pillate of tile and two bags of from lowes but nobody order it.
went to lowes to buy 31 cartons of tile. need 86, balance until March 4 to see the balance is 55 packages.
called Carlors come to check how to send the wall on Saturday 3:00 pm.
Bank of America said it needs three weeks to start the work. 2/17 check fico already.
2/14
2/13 Carlos came and gave 11,000 final 10,000; need three times to make sheetrock smooth, and cover the nail. painting job is ok or not, up to the preparation
check counter top
luckily we found the receipt to return the bathtub draniage to return back to Home Depot. They have a new law if you don't have a correct credit card or receipt you can not return
tax filing, efiling on Monday
2/12/2022 Saturday
hoa meeting on Saturday, we didn't touch covenant and bylaw yet.
on Friday, anisha and tusiita send a photo to Rudranii, i didn't prove it as ours. Why did they prove it with a bag of gabage send to me when i asked for a month ago. So they could collect them from my dumpster?
What are they doing? they always wanted to revenge.
2/13 Carlos called me we will meet at the house at 11:00 am
i try to sell wood and the car.
2/9
re order bifo foor, went to lowes and check the tile, filipe is working in the house; ficilitator called me in the morning, i sent him yama and niyama, 15 shillia
install a door 65.00; a cabinet 65.00; 50.00 for window trim, door trim
2/8 Monday
George left at 1:00 pm; finished sheet rock;
bifo door, need to review; regular door should be ok, pre-hund, 6 panel, jam (frame work)
2/7/2022
went to pop to buy doors, regular door, pre-hung,6 panel with jam, with door knob holes; Landa Pillipe started to put up tape, sanding work, George finished his sheet rock work.