1 roof single deliver on 9/27
2 ivan didn't do trim on the main door and other door
3 inspection on framing , plumber, and electricity
4 HVAC install
5 hvac inspection
6 roof install
7 insullaton, how to do it with superior door?
8 drywall
9 preparation for painting
10 install 5 doors
11 Jarrod Wells truck driver delivered 18 tons of Railroad Blister Rock to the land. cost $408.00
12 9/17 Friday deliver 3 pieces 6x6 24 ft pt deliver will be on next Tuesday 9/21/21
13 9/16 dilver 16 tons of railroad bailster rocks
14 ivan dilver 5 doors from pop n will do the main doors trim in lotus house; not yet 9/18
15 9/16 Ivan delivered 3 doors, there are 2 doors left for pick up from pops.
16 9/17 we found a place for they to stay. Can not extend the rental agreement; will discuss the more rental
17 9/17 they are leaving, he parked the truck on our parking lots.
18 9/16 mom bot a window for the basement room from lowes 4x3?
19 9/17 install the roof for starway area, i bot a blower to do the cleaning; erect an warning sign in the house
20 9/20 will deliver the wood log 4x4 24ft (no one has it)
21 9/21 Jo group coming back to work Today, we found a new place bnb for them
22 9/20 Lowes delivered 3 doors
23 9/20 Jenny didn't deliver 3 poles 6x6 24 ft, will let us know when
24 funneral for Terry on Wednesday
25 9/20 HVAC came to mark all the vandalation
26 9/20 Visha Mitra came to see the house
27 9/20 Ivan $2800 stucco wall and trim for window for Lotus house
28 9/20 went to College to see the tile, they have enough tiles to build 2 bathrooms
29 Ivan didn't return the door knobs and hinge to me
30 need to clear the boarder line
31 friday rainny day no one works, started to work on roof on wed and thursday.
32 Friday i ask David his workers can work on Sat and Sunday, Friday off, Monday and Tuesday can be off, if they think they work too hard.
33 10/11 two guys delivered the door, they didn't want to put the door in the room. i told them to bring it
back, if they didn't want to put the door in the room. delivered delay 2 hours until 6:00 pm, all the workers
have went back home. we went to LOWES to complain. the manager spiro talked to us. i arrange some of the wood need to return back to summit.
34 i called Ivan. He is sick. till Today, i called Alberto to confirm he is sick
35 we need a company who knows how to do fiber cement siding
36 10/20 yesterday i talked to Pisgah, a siding company, came to give an estimate; also, another 2; Dependra came to install fan for bathroom, plumber is coming on 10/21
37 can not find bath tub; tomorrow, there are two Victors will come to give estimate.
38 Sunday Hu came. 10/25 Monday Hu installed three door locks. We bot stabler and stable for 2x4 framing work.
39 10/25 Dada Maheshavarananda came back with BaoBao's car. Yuri came to see the siding. He and Michael are good friends. Michael install HVAC for us. Is he using recycled materials or not, Mr Huang said yes, he says no.
40 We got Victor offer. Hu installed 6ft door, some wood tube put nails on some 2x4 wood
41 Ordered 2 bathtub, one is left dranage, one is right dranage.
42 the main door buttom need to be fixed, skylights need framing, siding delay a week, tommy is coming
43 11/03 we went to visit Biltmore estate
44 Saturday morning, Ivan came to see how much he can do the framing.