Tuesday, December 14, 2021

01-01-2022

01/04/2022 insulation and framing inspection? Monday i went to DMV to get license plate; need 1.insurance for me and from Chris; deed no need notorize for Whashington D.C. deed, only need siganature, my north carolina driver license, 5 dollars cash and credit card for $480.00; i get a lisence plate right there, deed from N.C. will send it to me in 3 weeks. 12/31/2021 Insulation is finished. we call inspection, will come on Monday. 12/27 insulation working 12/20 baobao's flight at 2:00 pm; 12/18 Saturday raining appointment with Ivan, i wondered 2x4 frame need to be change also or not, or some part of the room, 2x4 is short, can support the ceiling, need to change? Ivan thought we didn't pay the attic ladder, actually we paied $2900 included the attic ladder installation. 12/16 Inspector Danny came and the basement 2x4 need to change to 2x6, Danny talked to Paco; Danny said 2x4 wood need to change to 2x6, we can do insulation, 12/15 yesterday i came for ivan he didnt come 12/14 on 12/13 i waited whole day the delivery guy said after the black mountain delivery will come to ours but no show up , i waited until 5:30 i drove to turnel lowes to complain to the manager Chamler somthing, he said he would call and told us whats happened, but no call and no solution to us at all, he just ignored everything, it seemed he didnt care. he was very 可悪, 12/14/2021 yesterday, we went to Lowes to ask for two bathtub return; they are doing it today, this morning they setup ours is the last pick up, may fall on between 2:00 and 4:00 pm 12/13 framing victor said we can call inspection. what is left is diipendra. he is sick of cold. don't know when will come back to work. can setup Friday be the insulation? 12/5 need to pick up another bathtub in another home depot. after monday need to order 60 pcs of 2x4x8 for framing, need to buy accessary for bathtub. 12/4 Saturday, sunny Saterday morning inteview with a drywall guy. yeterday we bot 2 regular bathtubs from Home Depot. 12/01/20121 Last night finished everything around 6:00 pm, Victor is an honest and helpful handyman. compare roofer david, a crooker, he sent 4 people came to check the roof the day before yesterday, 11/29/2021 or 11/30 Mark from HVAC came for last check before inspection Today, bob from superior wall came to see he wants to make a hole for cross space for insulation by the code. 11/29 Dallan brings a window. pay 220 to Victor for installation. 11/28/2021 Sunday Yesterday, Lowes delivered 2 bathtubs. Victor almost finished siding. 11/20/2021 Ivan came he finished his job on framing. cost 2900 plus the nail 53.48; Ivan didn't install ladder on the upper level where the air conditioning unit need to ask Mark from HVAC what is needed to be done from Diipendra rocksheet, drywall, preparation and paint 11/22/2021 sign contract with David from ff insulation; i clean up everywhere; i found a beam need a nail 11/23/2021 mark is coming, diipendra has done on the basement to install fan in the bath room; 40 We got Victor offer. Hu installed 6ft door, some wood tube put nails on some 2x4 wood 41 Ordered 2 bathtub, one is left dranage, one is right dranage. 42 the main door buttom need to be fixed, skylights need framing, siding delay a week, tommy is coming 43 11/03 we went to visit Biltmore estate 44 Saturday morning, Ivan came to see how much he can do the framing. 11/11 hu is going home tomorrow. he finished tile on lotus house today 11-12 Ivan came to do the framing, mark came to explain how to do it with the HVAC turnel. $2900.00 4 skylights. 11-13 2 bathtub deliver on Saturday 11/12 Ivan didn't come to work, because there is no wood, 2x4 indoor wood; Summit will deliver 40 pieces of 2x4; Tommy is bring his truck here ready to work on Monday 11/13 Ivan will come, ps paid jivatma, $600.00 for moving siding materials on the deck. 11/15 Monday Tommy work on the ceptic system, not the road, Ivan on framing, Plumber Chris works, need insulation, dry wall, sending and prepare for painting, painting, 11/16 Insulation appointment Today 10:30 am; Tommy will finish ceptic system Today; 1 roof single deliver on 9/27 2 ivan didn't do trim on the main door and other door 3 inspection on framing , plumber, and electricity 4 HVAC install 5 hvac inspection 6 roof install 7 insullaton, how to do it with superior door? 8 drywall 9 preparation for painting 10 install 5 doors 11 Jarrod Wells truck driver delivered 18 tons of Railroad Blister Rock to the land. cost $408.00 12 9/17 Friday deliver 3 pieces 6x6 24 ft pt deliver will be on next Tuesday 9/21/21 13 9/16 dilver 16 tons of railroad bailster rocks 14 ivan dilver 5 doors from pop n will do the main doors trim in lotus house; not yet 9/18 15 9/16 Ivan delivered 3 doors, there are 2 doors left for pick up from pops. 16 9/17 we found a place for they to stay. Can not extend the rental agreement; will discuss the more rental 17 9/17 they are leaving, he parked the truck on our parking lots. 18 9/16 mom bot a window for the basement room from lowes 4x3? 19 9/17 install the roof for starway area, i bot a blower to do the cleaning; erect an warning sign in the house 20 9/20 will deliver the wood log 4x4 24ft (no one has it) 21 9/21 Jo group coming back to work Today, we found a new place bnb for them 22 9/20 Lowes delivered 3 doors 23 9/20 Jenny didn't deliver 3 poles 6x6 24 ft, will let us know when 24 funneral for Terry on Wednesday 25 9/20 HVAC came to mark all the vandalation 26 9/20 Visha Mitra came to see the house 27 9/20 Ivan $2800 stucco wall and trim for window for Lotus house 28 9/20 went to College to see the tile, they have enough tiles to build 2 bathrooms 29 Ivan didn't return the door knobs and hinge to me 30 need to clear the boarder line 31 friday rainny day no one works, started to work on roof on wed and thursday. 32 Friday i ask David his workers can work on Sat and Sunday, Friday off, Monday and Tuesday can be off, if they think they work too hard.

No comments:

Post a Comment