Tuesday, December 14, 2021
01-01-2022
01/04/2022 insulation and framing inspection? Monday i went to DMV to get license plate; need 1.insurance for me and from Chris; deed no need notorize for Whashington D.C. deed, only need siganature, my north carolina driver license, 5 dollars cash and credit card for $480.00; i get a lisence plate right there, deed from N.C. will send it to me in 3 weeks.
12/31/2021
Insulation is finished. we call inspection, will come on Monday.
12/27 insulation working
12/20 baobao's flight at 2:00 pm;
12/18 Saturday raining
appointment with Ivan, i wondered 2x4 frame need to be change also or not, or some part of the room, 2x4 is short, can support the ceiling, need to change?
Ivan thought we didn't pay the attic ladder, actually we paied $2900 included the attic ladder installation.
12/16 Inspector Danny came and the basement 2x4 need to change to 2x6, Danny talked to Paco; Danny said 2x4 wood need to change to 2x6, we can do insulation,
12/15
yesterday i came for ivan he didnt come
12/14
on 12/13 i waited whole day the delivery guy said after the black mountain delivery will come to ours but no show up , i waited until 5:30 i drove to turnel lowes to complain to the manager Chamler somthing, he said he would call and told us whats happened, but no call and no solution to us at all, he just ignored everything, it seemed he didnt care. he was very 可悪,
12/14/2021
yesterday, we went to Lowes to ask for two bathtub return; they are doing it today, this morning they setup ours is the last pick up, may fall on between 2:00 and 4:00 pm
12/13 framing victor said we can call inspection. what is left is diipendra. he is sick of cold. don't know when will come back to work. can setup Friday be the insulation?
12/5
need to pick up another bathtub in another home depot.
after monday need to order 60 pcs of 2x4x8 for framing, need to buy accessary for bathtub.
12/4 Saturday, sunny
Saterday morning inteview with a drywall guy.
yeterday we bot 2 regular bathtubs from Home Depot.
12/01/20121
Last night finished everything around 6:00 pm, Victor is an honest and helpful handyman. compare roofer david, a crooker, he sent 4 people came to check the roof the day before yesterday, 11/29/2021 or 11/30
Mark from HVAC came for last check before inspection
Today, bob from superior wall came to see he wants to make a hole for cross space for insulation by the code.
11/29
Dallan brings a window. pay 220 to Victor for installation.
11/28/2021 Sunday
Yesterday, Lowes delivered 2 bathtubs. Victor almost finished siding.
11/20/2021
Ivan came he finished his job on framing. cost 2900 plus the nail 53.48;
Ivan didn't install ladder on the upper level where the air conditioning unit
need to ask Mark from HVAC what is needed to be done from Diipendra
rocksheet, drywall, preparation and paint
11/22/2021
sign contract with David from ff insulation; i clean up everywhere; i found a beam need a nail
11/23/2021
mark is coming, diipendra has done on the basement to install fan in the bath room;
40 We got Victor offer. Hu installed 6ft door, some wood tube put nails on some 2x4 wood
41 Ordered 2 bathtub, one is left dranage, one is right dranage.
42 the main door buttom need to be fixed, skylights need framing, siding delay a week, tommy is coming
43 11/03 we went to visit Biltmore estate
44 Saturday morning, Ivan came to see how much he can do the framing.
11/11 hu is going home tomorrow. he finished tile on lotus house today
11-12 Ivan came to do the framing, mark came to explain how to do it with the HVAC turnel. $2900.00 4 skylights.
11-13 2 bathtub deliver on Saturday
11/12 Ivan didn't come to work, because there is no wood, 2x4 indoor wood; Summit will deliver 40 pieces of 2x4; Tommy is bring his truck here ready to work on Monday
11/13 Ivan will come,
ps paid jivatma, $600.00 for moving siding materials on the deck.
11/15 Monday Tommy work on the ceptic system, not the road, Ivan on framing, Plumber Chris works,
need insulation, dry wall, sending and prepare for painting, painting,
11/16 Insulation appointment Today 10:30 am; Tommy will finish ceptic system Today;
1 roof single deliver on 9/27
2 ivan didn't do trim on the main door and other door
3 inspection on framing , plumber, and electricity
4 HVAC install
5 hvac inspection
6 roof install
7 insullaton, how to do it with superior door?
8 drywall
9 preparation for painting
10 install 5 doors
11 Jarrod Wells truck driver delivered 18 tons of Railroad Blister Rock to the land. cost $408.00
12 9/17 Friday deliver 3 pieces 6x6 24 ft pt deliver will be on next Tuesday 9/21/21
13 9/16 dilver 16 tons of railroad bailster rocks
14 ivan dilver 5 doors from pop n will do the main doors trim in lotus house; not yet 9/18
15 9/16 Ivan delivered 3 doors, there are 2 doors left for pick up from pops.
16 9/17 we found a place for they to stay. Can not extend the rental agreement; will discuss the more rental
17 9/17 they are leaving, he parked the truck on our parking lots.
18 9/16 mom bot a window for the basement room from lowes 4x3?
19 9/17 install the roof for starway area, i bot a blower to do the cleaning; erect an warning sign in the house
20 9/20 will deliver the wood log 4x4 24ft (no one has it)
21 9/21 Jo group coming back to work Today, we found a new place bnb for them
22 9/20 Lowes delivered 3 doors
23 9/20 Jenny didn't deliver 3 poles 6x6 24 ft, will let us know when
24 funneral for Terry on Wednesday
25 9/20 HVAC came to mark all the vandalation
26 9/20 Visha Mitra came to see the house
27 9/20 Ivan $2800 stucco wall and trim for window for Lotus house
28 9/20 went to College to see the tile, they have enough tiles to build 2 bathrooms
29 Ivan didn't return the door knobs and hinge to me
30 need to clear the boarder line
31 friday rainny day no one works, started to work on roof on wed and thursday.
32 Friday i ask David his workers can work on Sat and Sunday, Friday off, Monday and Tuesday can be off, if they think they work too hard.