8/6
8/5
1.Abel installed microwave. patching some holes upper lever on 106.
2.Abel put a board on the wood floor by the side of stack dryer and washer.
3.Patching on upper level bathrooms
8/4
fix wood floor by Mill his phone number is 828-206-5412; his wife do cleaning Amanda her phone is 828-206-3867
7/21
plumber comes to turn water heater and check the water pressure, but need to install another faucet under sun room
2 HVAC come to turn on air conditioning, check the mini split where the remote controller
3 abel need to install mail box and do cleaning,
lowes deliver
7/20/2022 Wed
Yesterday Gorden called French Broad we got the permit, they came to transfer the power into the box so we can have electricity in the house. we turned on the power and found out no light on the upper level of the house. Diipendran called Dima to come to fix it. Hood button didn't work. i went to Lowes and talked to Andra, he said he will call the vendor and ask them to come to replace the mode. i bot two dish disposal oords and some LED light bulb.
Abel didn't show up. He need to hang up mirros, and put tile at the back of the sink on upper level bed rooms. we don't know how to use hot water yet. we call HVAC and talked to Alex. They will come on Thursday to connect everything, include the water heater, water heater use gas.
7/18/2022 Monday
we called inspection last Friday, 7/15. This morning we pass inspection and got permit to move in. 7/15 Friday Abel finished the door on cross space, double band all porch band, means on the deck, need two bank wood, all 2x12, but Johnanson only put one wood. and also need to brase all the 6x6 post, using 4x4 post wood. regarding plumber, need to put on the round of the pipe.
7/16 and 7/17 Sat and Sun two days moving. Nick and Elliot could not move the piano to the upper level. i decided to call someone else to move. 7/18 Monday 4:30 Alex came with 2 others to help to move the piano. cost i think $350.00; Ruth was afraid i piad too little so she decided she would sign them a check. 7/9 to 11 baobao came back to visit us with his girl friend, jessi.
install regular door, prehund, 65.00/each, cabinet 65.00/each, Vanity 55.00/ea. Lowes 40.00/each; wood floor 2.50, 3.00 to 3.50/sq ft, Lowes 2.60/sq ft; stairway, each step 60.00 70.00/each
trim for one door, trim for one window
storm door 130/each;
paint 10,000
shane quote $5555.00 : 65.00 for one cabinet 20 cabines total 1300.00; 65.00 for one door, 9 bifo door, 20 regular prehund door, how many windows trim?
dumpter swap schedule:
2/8 one time
before 2/8 two times
2/12Saturday
yesterday we found out there were no ceilings on two closet on the upper level; some places need to have 2x4 there.
on the sun room we will put a french door, on the top of the french door, we will put a glass up there.
2/15 call and swap dumpster
i paid Brian $60 to put tile to basement, 50.00 to put tile inside of the house
i ask jay to bring the tile from lotus house to our house
Carlor finished half job on painting, we paid him cash
4/21/2022
Continued wood floor, funny is Bruce wood some thicker, some thinner; they used to work on unfinished; Victor promised me to work on stairway.
Southern state Dennie came to dig a ditch and hook up to the house. Need to inform Scott Muller to bring gas into the house and fill the tank up with gas.
Jay worked half day.
Mom bot so many bushes.
4/20/2022
Wed
Monday is easter monday, i didn't know stock market is open.
Tuesday i went to French Board paid the bill and report to them, they want me to dig first. Diipendra, Shenna talked to Diipendran about the Enginner, Engineer need to come to tell us how to dig.where to dig
Wed Victor will come and he send someone to come to do the flooring.
Yesterday we went to lowes and found out we don't have the material for the installation.
Today, 3 pm Rocket Mortgage come to do the closing.
Jay started to work on tile, Victor started to work on wood floor, i went to lowes to buy base board 15 pieces
4/12/22 Monday
Truett could not dig Today is raining.
4/11 wood floor delivered, i text Victor,
Jay will come to work this week?
Shane give a quote $5000 for the ramp
3/22/2022
Today rains. Last two days they came to work on the land.
3/25 Lowes will deliver wood floor and tile.
3/17/2022 Thursday
&649.48 buy bifo doors and one 28 prehund left hindge door; shane bot and picked up at 8:40 am
$50.00 plus 30.00 cash give to Brian to move the tile to our house
Monday gutter guy install gutter, Wed raining, no work
bifo door from Pod's didn't work in our house, only the Lowes bifo door works
3/7/2022
measurement is wrong on high and length. we need to order a new cabinet.
shane came to work. Lowes didn't deliver the trims etc we ordered.
crown we need to return them.
Carlos didn't come because he didn't pay registered fee on two cars. his son came.
we bot three boxes of tiles for sunroom
3/3/2020 Thursday
Yesterday we stayed home. Tusiita they wanted us to pay their so called shared driveway. we tried to find 0 percent interest.
mom found a company can do the road, charge half of the Tommy charged.
2/26 Saturday
bot a printer
bot 40 gallon ceiling paint x 14.45 = 578.00 and wall paint egg 5x26.45=132.25
3/1/2022 Monday
we went to didi and got $5000 we deposited it.
Carlors painted the prime, the ceiling. spent more than 2000 paint oil.
Next monday shane is coming to install the door. we went to Lowes to make sure everything will deliver on Friday.
2/26
bot countertop core stone from Home Depot, compare granite, core is more. 24 months 0 percent. $100 discount. total $5698.00 Why Home Depot share dropped so much. two closets no ceiling.
2/24
bought 2 24 bifo doors and 1 36inch prehund right hindge door, trim wood tube, in Weaverville lowes,
bot prime from sherwin william,
sheerock still need to do something, cleaning job
war last night russia troops went into Ukraine
2/17
They wanted to make a deal with carvana. next wed appointment
Landa Pilipe finished taping and parting. Today Saturday will do sending. need two days to finish.
Christopher Shane will come to see how to install door.
Dumpster change back to the place
saw a pillate of tile and two bags of from lowes but nobody order it.
went to lowes to buy 31 cartons of tile. need 86, balance until March 4 to see the balance is 55 packages.
called Carlors come to check how to send the wall on Saturday 3:00 pm.
Bank of America said it needs three weeks to start the work. 2/17 check fico already.
2/14
2/13 Carlos came and gave 11,000 final 10,000; need three times to make sheetrock smooth, and cover the nail. painting job is ok or not, up to the preparation
check counter top
luckily we found the receipt to return the bathtub draniage to return back to Home Depot. They have a new law if you don't have a correct credit card or receipt you can not return
tax filing, efiling on Monday
2/12/2022 Saturday
hoa meeting on Saturday, we didn't touch covenant and bylaw yet.
on Friday, anisha and tusiita send a photo to Rudranii, i didn't prove it as ours. Why did they prove it with a bag of gabage send to me when i asked for a month ago. So they could collect them from my dumpster?
What are they doing? they always wanted to revenge.
2/13 Carlos called me we will meet at the house at 11:00 am
i try to sell wood and the car.
2/9
re order bifo foor, went to lowes and check the tile, filipe is working in the house; ficilitator called me in the morning, i sent him yama and niyama, 15 shillia
install a door 65.00; a cabinet 65.00; 50.00 for window trim, door trim
2/8 Monday
George left at 1:00 pm; finished sheet rock;
bifo door, need to review; regular door should be ok, pre-hund, 6 panel, jam (frame work)
2/7/2022
went to pop to buy doors, regular door, pre-hung,6 panel with jam, with door knob holes; Landa Pillipe started to put up tape, sanding work, George finished his sheet rock work.